HOME > File Libraries > Simming Logs > Star Trek: Andromeda 9/21/10

STAR TREK: ANDROMEDA 9/21/10

Uploaded By: blackjack
Uploaded: 09/21/10
Simulation: Star Trek: Andromeda
 
File: trekandromeda-9-21-10.html            Size: 52050 (bytes)
Downloaded: 3150 times
 
Description:
EPISODE 109: "Heavy Weather: Part II" (21 September 2010)

The Odyssey team stranded on Dystros continues their investigations and repair work. Valerian, Sandiago, Kavur, Miller, Stenton, and Swift reach the Kelvan facility which had been appearing sporadically on sensors and break through the rusted-over security system to find that the facility appears heavily used but abandoned. Cameron, O'Callaghan, Arex, and Sullivan continue work on the downed shuttle, harnessing the energy of the planet's electrical storms as power for the damaged craft.